Pre-emptive concurrent design planning and scheduling.

Matthews, P. C. and Coates, G. (2007) 'Pre-emptive concurrent design planning and scheduling.', 16th International Conference on Engineering Design Paris, 28-31 Aug 2007 .

Abstract

This paper introduces a significant revision to the Concurrent Engineering (CE) methodology that enables a shortened project completion time. Under the CE methodology, sequential tasks can only be performed as such. We introduce a method for starting sequential tasks concurrently using a preemptive approach. Where there are a, suitably small, finite number of possible alternative subsequent tasks, we propose that a more agile approach is to begin work on these alternative subsequent tasks concurrently to the preceding task, sharing the resource needed for the subsequent task amongst the different alternatives. Further, where the probability for each alternative task is known, we demonstrate that by setting the resource allocation equal to the probabilities of each outcome, it is possible allocate resources to minimise the expected completion of the overall project. A simple two task case study is developed and analysed to illustrate this method. The paper concludes by revisiting the original assumptions and discussing how resource efficiency is traded off for minimising project completion time.

Item Type:Conference item (Paper)
Keywords:Agility, Process Simulation, Concurrent Engineering, Resource Allocation
Full text:PDF - Accepted Version (142Kb)
Status:Peer-reviewed
Publisher Web site:http://www.designsociety.org/
Record Created:27 Aug 2008
Last Modified:15 Sep 2011 15:28

Social bookmarking: del.icio.usConnoteaBibSonomyCiteULikeFacebookTwitterExport: EndNote, Zotero | BibTex
Usage statisticsLook up in GoogleScholar | Find in a UK Library