Cookies

We use cookies to ensure that we give you the best experience on our website. By continuing to browse this repository, you give consent for essential cookies to be used. You can read more about our Privacy and Cookie Policy.


Durham Research Online
You are in:

Planning and operating non-firm distributed generation.

Keane, A. and Zhou, Q. and Bialek, J. W. and O'Malley, M. (2009) 'Planning and operating non-firm distributed generation.', IET renewable power generation., 3 (4). pp. 455-464.

Abstract

The penetration of distributed generation (DG) is increasing on distribution networks across the world. Non-firm access to the network is now being proposed as a cost effective way to facilitate DG. However, concerns remain about the operational details of non-firm access and also with regard to the financing of DG projects, which, by their nature, are not guaranteed permission to export power at all times. Here, the pertinent planning and operational issues that arise with non-firm access are analysed. The index of coincidence is used to assess the probability of constraint breaches, through analysis of historical generation and load profiles. Further to this, a novel method is proposed, which minimises the cost to the generators of non-firm access through coordinated operation.

Item Type:Article
Keywords:Distributed generation, Distribution networks, Planning.
Full text:Full text not available from this repository.
Publisher Web site:http://dx.doi.org/10.1049/iet-rpg.2008.0058
Record Created:15 Feb 2010 13:20
Last Modified:15 Feb 2010 16:12

Social bookmarking: del.icio.usConnoteaBibSonomyCiteULikeFacebookTwitterExport: EndNote, Zotero | BibTex
Usage statisticsLook up in GoogleScholar | Find in a UK Library