Cookies

We use cookies to ensure that we give you the best experience on our website. By continuing to browse this repository, you give consent for essential cookies to be used. You can read more about our Privacy and Cookie Policy.


Durham Research Online
You are in:

Wind turbine productivity considering electrical subassembly reliability.

Arabian-Hoseynabadi, H. and Oraee, H. and Tavner, P. J. (2010) 'Wind turbine productivity considering electrical subassembly reliability.', Renewable energy., 35 (1). pp. 190-197.

Abstract

This paper proposes a reliability model for the electrical subassemblies of geared wind turbine systems with induction generators. The model is derived considering the failure of main subassemblies and their parameters are calculated. A productivity comparison is performed between the selected wind turbine systems including reliability issues. Two methods of modification for variable-speed wind turbines with Doubly Fed Induction Generators (DFIG) to improve their availability are finally suggested.

Item Type:Article
Keywords:Wind turbine, Doubly Fed Induction Generator (DFIG), Reliability model.
Full text:Full text not available from this repository.
Publisher Web site:http://dx.doi.org/10.1016/j.renene.2009.04.014
Record Created:06 Apr 2010 15:35
Last Modified:08 Apr 2010 15:48

Social bookmarking: del.icio.usConnoteaBibSonomyCiteULikeFacebookTwitterExport: EndNote, Zotero | BibTex
Usage statisticsLook up in GoogleScholar | Find in a UK Library